Shipping takes place within 3-5 business days. If there is a problem with the shipment of the product, we will notify you via the email address you entered when ordering.
MyLoc8
GPS Tracker for Vehicles with Magnet– 4G LTE Real-Time Location Device with App, Built-in SIM, 14-Day Battery – Anti-Theft GPS Tracker for Car, Motorcycle, Scooter, Bike - 4-Mo Subscription Incl
GPS Tracker for Vehicles with Magnet– 4G LTE Real-Time Location Device with App, Built-in SIM, 14-Day Battery – Anti-Theft GPS Tracker for Car, Motorcycle, Scooter, Bike - 4-Mo Subscription Incl
Couldn't load pickup availability
Overview
- Brand : MYLOC8
- Special Feature : Alert Notification, Geo-Fence, Location History, Real Time Tracking, Weather Resistant
- Connectivity Technology : 4G, Bluetooth, Wi-Fi
- Supported Application : GPS (iOS, Android), Web Platform
- Specific Uses For Product : Commercial GPS Tracking, Vehicle GPS Tracking, Worldwide GPS Tracking
About this item
- Protect What Matters Most – Track your car, truck, or fleet in real time with our GPS tracker for vehicles. Get instant alerts on movement or unauthorized access, giving you peace of mind 24/7.
- Stay in Control, Anywhere – Using our free iOS & Android app, view precise live locations anytime. The built-in SIM offers reliable 4G LTE tracking with flexible subscription plans
- Discreet Yet Powerful – Our mini GPS tracker for vehicles is compact, waterproof (IP65), and easily hidden. Ideal as a car tracker device hidden from view for anti-theft protection
- No Tools Needed – Quick setup. Attach the device using strong magnets—no wiring, no hassle. Great for fleet tracking, teen drivers, or company vehicles
- Long-Lasting Peace of Mind – Track for up to 14 days on a single charge. This tracking device for cars ensures uninterrupted monitoring when it matters most
Share

Blog Posts
View all-
Car Electronics Canadian Drivers Rely on for Sa...
Car Electronics Canadian Drivers Rely on for Safety, Navigation, and Connectivity Modern driving depends heavily on technology. From navigation assistance to hands-free communication, car electronics play a key role in...
Car Electronics Canadian Drivers Rely on for Sa...
Car Electronics Canadian Drivers Rely on for Safety, Navigation, and Connectivity Modern driving depends heavily on technology. From navigation assistance to hands-free communication, car electronics play a key role in...
-
Brake System Components Canadian Drivers Should...
Brake System Components Canadian Drivers Should Inspect and Replace Regularly Your vehicle’s brake system is one of the most critical safety components on the road. In Canada, where wet roads,...
Brake System Components Canadian Drivers Should...
Brake System Components Canadian Drivers Should Inspect and Replace Regularly Your vehicle’s brake system is one of the most critical safety components on the road. In Canada, where wet roads,...
-
Body & Trim Accessories That Protect Your Vehic...
Body & Trim Accessories That Protect Your Vehicle’s Appearance in Canada Your vehicle’s exterior is constantly exposed to harsh elements—road salt, debris, moisture, and UV rays. For Canadian drivers, body...
Body & Trim Accessories That Protect Your Vehic...
Body & Trim Accessories That Protect Your Vehicle’s Appearance in Canada Your vehicle’s exterior is constantly exposed to harsh elements—road salt, debris, moisture, and UV rays. For Canadian drivers, body...